To Download the 2009 Design Standards in PDF form please click on the links below.

Application Checklist

2009 Design Standards

Warranty

 

 

Air Vacuum/Air Release Detail

Fire Hydrant Detail

Flushing Hydrant Detail

Galvanic Anode Installation Detail

Manhole Bases Detail

Manhole Channel Detail

Pipeline Marker Detail

Sanitary Sewer Manhole Detail

Sanitary Sewer Service Line Detail

Tapping Sleeve Connection Detail

Trench Bedding and Backfill Detail

Valve or Tee Connection & Valve Box Detail

Water Service Connection Detail

Watermain Valve Detail

Watermain Valve Thrust Block Detail

 






Copyright © 2008 Wright Water and Sewer District - All Rights Reserved
Site Development by Cowgirl Creations Web Design