Sizing of Water Mains

The construction of the main shall meet all DEQ standards.  Minimum water main size shall be 6″.  If the main is within the Town of Wright, the main shall be sized and looped to provide for fire protection.  If the main is outside the corporate limits of the Town of Wright, the District may require mains to provide for fire protection.  If the main is outside the corporate limits of the Town of Wright, the District may require mains to provide fire flows when deemed necessary.  Each case shall be reviewed on an individual basis.
(Approved April 8, 1999)